Issuance of Occupancy Certification for the Building Construction

Post-construction Comprehensive List of Documents (Single Window)

Low Risk

  1. House water supply layout drawing.
  2. House Sewer pipe/drain layout drawing.
  3. Certificate of Licensed Plumber.
  4. Approved Building Plan.
  5. Building Permit/Renewal Certificate/Revalidation Certificate.
  6. Plinth Level Completion Certificate.
  7. Completion Plan (Drawing).
  8. Up to date paid up Municipal Property Tax receipt of the concerned holding.
  9. Mutation Certificate of BLLRO/ Record-of-Rights (Parcha) from BLLRO office for change of ownership (Only if there is any change)

Medium Risk

  1. House water supply layout drawing.
  2. House Sewer pipe/drain layout drawing.
  3. Certificate of Licensed Plumber.
  4. Approved Building Plan.
  5. Building Permit/Renewal Certificate/Revalidation Certificate.
  6. Plinth Level Completion Certificate.
  7. Completion Plan (Drawing).
  8. Up to date paid up Municipal Property Tax receipt of the concerned holding.
  9. Mutation Certificate of BLLRO/ Record-of-Rights (Parcha) from BLLRO office for change of ownership (Only if there is any change)
  10. Structural Stability Certificate of Structural Engineer (in case of medium risk building)

High Risk

  1. House water supply layout drawing.
  2. House Sewer pipe/drain layout drawing.
  3. Certificate of Licensed Plumber.
  4. Approved Building Plan.
  5. Building Permit/Renewal Certificate/Revalidation Certificate.
  6. Plinth Level Completion Certificate.
  7. Completion Plan (Drawing).
  8. Up to date paid up Municipal Property Tax receipt of the concerned holding.
  9. Mutation Certificate of BLLRO/ Record-of-Rights (Parcha) from BLLRO office for change of ownership (Only if there is any change)

Post-construction Comprehensive List of Documents (Single Window)

a) Issuance of Fire Safety Certificate (FSC) by West Bengal Fire Service & Emergency Services Directorate under Department of Fire & Emergency Services, Govt. of West Bengal

  1. Key Location Plan(1:4000)
  2. Site Plan(1:600)
  3. Section Elevation Plan
  4. Typical Building Plan
  5. Structured Drawings
  6. Roof Plan(1:100)
  7. Area Statement
  8. Master Plan Drawing
  9. Floor Plan(1:100)
  10. Building Completion Certificate
  11. Copy of the Last FSR / RFSR issued by the Department
  12. Copy of Last FSC or Part FSC document
  13. Legal Ownership Document / Registered Deed
  14. PAN Card of the Applicant
  15. Electrical Wiring/Installation Report by Competent Authority
  16. Building Plan Sanctioned by Competent Authority
  17. Supporting Document for Conduction of Fire Drill
  18. Applicants Proof of Identity
  19. Supporting Document for Conduction of Evacuation Drill
  20. Proof of Power of Attorney
  21. Previous RFSR

b) License to work a Lift / Escalator by Directorate of Electricity under Department of Power & Non-conventional Energy Sources, Government of West Bengal

  1. Permission Letter to Erect a Lift.
  2. Application Form B signed by Owner of the lift and countersigned by Erecting Firm with seal.
  3. Safety Certificate regarding functioning of over speed governor, car safety unit, Buffer, Brakes, Terminal and Final stopping device and locking device.
  4. Manufacturers Certificate regarding quality, material construction of main suspension ropes, insulation of electrical equipment, speed governor, key of driving sheave etc.
  5. Wiring Diagram for control panel and Lift equipment.
  6. Details of Motor, gear, pulleys, ropes etc. as installed in the lift.
  7. Test form issued by the licensed electrical contractor on electrical aspect of the lift.
  8. Wiring diagram of the control panel and the lift equipment.
  9. Current Property Tax receipt for Proof of Ownership.
  10. Sanctioned Building Plan.
  11. Duly approved Layout drawing of the Lift. Layout Drawing should mention Drawing Number and Date of Approval of competent authority.
  12. Self Declaration by owner indicating the layout drawing of Lift is made as per the duly sanctioned plan.
  13. Self Declaration by Lift Erecting Firm indicating the layout drawing of Lift is made as per the duly sanctioned plan.